Description

  • Commissioning dateJanuary 1995
  • Installed capacity6 MW
    Générique Hydro - Banner Hydro

    Technical data

    • Flow175 m³/s
    • Head5 m
    • FacilityRun of the river
    • RiverSaint-Laurent

    About Boralex

    All you need to know about Boralex's activity worldwide.

    This way

    Technicien souriant

    Saint-Lambert hydroelectric power plant
    at a glance

    Located near the Saint-Lambert locks, close to the Saint Lawrence River, the Saint-Lambert power plant was built in 1993 and commissioned in 1995. It produces 6 MW of hydroelectricity.