97 Wind turbines

Technical data
- TurbinesVestas V100/2MW


Spinning Spur 3 wind farm
at a glance
Located in Oldham County, TX. Commissioned in 2015 and has a PPA with City of Georgetown / City of Garland expiring in September 2035. This project includes 97 Vestas V100/2MW wind turbines. Boralex owns 50% of this site's interest. The total installed capacity of the site is 194 MW.