45 Wind turbines

Technical data
- TurbinesEnercon E82
- Rotor diameter82 m
- Platform height78 m
- Blade size41 m

Thames River wind farm
at a glance
Thames River is developed in two phases. Phase 1 is composed of 4 wind sites (Bisnett Line, Front Line, Marsh Line and Swanton Line) totaling 40 MW installed capacity. It was commissioned in 2009. Phase 2 is composed of 5 wind sites (Gracey, Naylor, North Malden, Richardson and South Side) totaling 50 MW installed capacity. It was commissioned in 2010.
- Both phases of the Thames River site are covered by a 20-year power purchase agreement with Ontario Power Authority.